Enel X JuicePump 175 kW

From EV Charger Wiki

Enel X - JuicePump 175 kW Charging Station

Elevate your business's electric vehicle infrastructure with the Enel X JuicePump 175kW, an innovative evolution of the JuicePump 50kW DC fast charging solution. This cutting-edge charger, designed for high-utilization environments like fleets and refueling stations, offers rapid charging, attracting new customers to your establishment. Take advantage of low-cost installations with utility or government incentives while providing a seamless experience for electric vehicle drivers. The JuicePump 175kW ensures an 80% charge in just 20 minutes, enhancing convenience and minimizing maintenance costs with its state-of-the-art liquid-cooling system.

Charging Speed

Experience unparalleled charging speed with the Enel X JuicePump 175kW. Achieve an impressive 80% battery capacity in under 20 minutes, setting a new standard for efficiency in the electric vehicle charging landscape.
Enel X JuicePump 175 kW.png
JuicePump 175 kW.jpg

Technical Specifications

USER UNIT
Connectors Single CCS (Type 1); Dual CHadeMO and CCS (Type 1)
Cord Length 13.5 ft
Output current CCS up tp 350A; CHAdeMO up tp 200A
Output Voltage 200 V to 920 V DC
Electrical Output Up to 175 kW
Supply Frequency 60 Hz
IP/IK Rating IP65, NEMA Type 3R
Temperature -35°C to 50°C (-31°F to 122°F)
Weight 573 lbs/260 kg
Dimensions H: 6.7 in / 2011 mm x W: 3.3 in / 993 mm x D: 1.9 in / 532 mm
Certifications cUL, UL, CHAdeMO, RCM, FCC, IC
POWER UNIT
Input 480VAC (Canada 600VAC) +/-10% 3ph
Output Voltage 950V DC
Electrical Output Up to 178 kW
Maximum length for buried cable for AC link as described above 656ft/200m
Maximum Current At 480 VAC - 250A (Canada at 600VAC - 200A)
Supply Frequency 60 Hz +/-10%
Efficiency >96.5%
Overcurrent Protection UL Listed 320A (Canada 250A) Breaker (The nominal rating must not exceed 320A in order to maintain primary protection for the LV transformer)
Product Warranty 2 years
User Rating N/A
Price N/A

Smart Features of Enel X - JuicePump 175 kW

  • Fast Charging Attraction: Draw in new customers or tenants by offering lightning-fast charging capabilities.
  • Rapid Charge Time: Enable drivers to reach 80% battery capacity in less than 20 minutes for quick and efficient refueling.
  • Convenient Payment Options: Drivers can easily access and pay through mobile devices or an optional credit card terminal, ensuring a hassle-free charging experience.
  • Dual Cable Accessibility: Enhance user convenience with two 13.5 ft cables for flexible and accessible charging.
  • Modular Design for Cost Savings: Optimize capital expenditure with a modular and field-upgradable DCFC design, allowing for easy scalability.
  • Wide Compatibility: CCS-1 and CHAdeMO compliance guarantees compatibility with all EVs, with the option to charge Tesla vehicles using an adapter.

JuicePump 180-360 .png

Product guides and documents of Enel X - JuicePump 175 kW

Advantages of the Enel X - JuicePump 175 kW

  • Low-Cost Installation: Benefit from cost-effective installations supported by utility or government incentives.
  • Swift Charging: Attract and retain customers with the ability to charge up to 80% in just 20 minutes.
  • Flexible Payment Options: Provide drivers with multiple payment options, including mobile and credit card, enhancing user convenience.
  • Durable and Reliable: Built to last, the JuicePump 175kW features a state-of-the-art liquid-cooling system for smooth operation in all conditions.
  • Revenue Generation Options: Explore revenue opportunities with the Credit Card Reader (CCR) and in-app software payment options.

Disadvantages of the Enel X - JuicePump 175 kW

  • Tesla Adapter Requirement: Compatibility with Tesla vehicles requires the use of an adapter.
  • Initial Cost Investment: While incentivized, the initial installation may still involve upfront costs.
  • Regular Maintenance Needed: Despite the advanced cooling system, regular maintenance is essential for optimal performance.
  • Limited Coverage: As with any charging station, the accessibility of the JuicePump 175kW may be limited to specific geographic areas.
  • Dependency on External Incentives: Installation cost savings depend on the availability and eligibility for utility or government incentives.
  • Advanced Features May Require Additional Investment: Leveraging advanced software features like JuiceNet Enterprise may involve additional costs.

Where to buy