Enel X JuicePump 175 kW
Enel X - JuicePump 175 kW Charging Station
Elevate your business's electric vehicle infrastructure with the Enel X JuicePump 175kW, an innovative evolution of the JuicePump 50kW DC fast charging solution. This cutting-edge charger, designed for high-utilization environments like fleets and refueling stations, offers rapid charging, attracting new customers to your establishment. Take advantage of low-cost installations with utility or government incentives while providing a seamless experience for electric vehicle drivers. The JuicePump 175kW ensures an 80% charge in just 20 minutes, enhancing convenience and minimizing maintenance costs with its state-of-the-art liquid-cooling system.
Charging Speed
Experience unparalleled charging speed with the Enel X JuicePump 175kW. Achieve an impressive 80% battery capacity in under 20 minutes, setting a new standard for efficiency in the electric vehicle charging landscape.
Technical Specifications
USER UNIT | |
Connectors | Single CCS (Type 1); Dual CHadeMO and CCS (Type 1) |
Cord Length | 13.5 ft |
Output current | CCS up tp 350A; CHAdeMO up tp 200A |
Output Voltage | 200 V to 920 V DC |
Electrical Output | Up to 175 kW |
Supply Frequency | 60 Hz |
IP/IK Rating | IP65, NEMA Type 3R |
Temperature | -35°C to 50°C (-31°F to 122°F) |
Weight | 573 lbs/260 kg |
Dimensions | H: 6.7 in / 2011 mm x W: 3.3 in / 993 mm x D: 1.9 in / 532 mm |
Certifications | cUL, UL, CHAdeMO, RCM, FCC, IC |
POWER UNIT | |
Input | 480VAC (Canada 600VAC) +/-10% 3ph |
Output Voltage | 950V DC |
Electrical Output | Up to 178 kW |
Maximum length for buried cable for AC link as described above | 656ft/200m |
Maximum Current | At 480 VAC - 250A (Canada at 600VAC - 200A) |
Supply Frequency | 60 Hz +/-10% |
Efficiency | >96.5% |
Overcurrent Protection | UL Listed 320A (Canada 250A) Breaker (The nominal rating must not exceed 320A in order to maintain primary protection for the LV transformer) |
Product Warranty | 2 years |
User Rating | N/A |
Price | N/A |
Smart Features of Enel X - JuicePump 175 kW
- Fast Charging Attraction: Draw in new customers or tenants by offering lightning-fast charging capabilities.
- Rapid Charge Time: Enable drivers to reach 80% battery capacity in less than 20 minutes for quick and efficient refueling.
- Convenient Payment Options: Drivers can easily access and pay through mobile devices or an optional credit card terminal, ensuring a hassle-free charging experience.
- Dual Cable Accessibility: Enhance user convenience with two 13.5 ft cables for flexible and accessible charging.
- Modular Design for Cost Savings: Optimize capital expenditure with a modular and field-upgradable DCFC design, allowing for easy scalability.
- Wide Compatibility: CCS-1 and CHAdeMO compliance guarantees compatibility with all EVs, with the option to charge Tesla vehicles using an adapter.
Product guides and documents of Enel X - JuicePump 175 kW
Advantages of the Enel X - JuicePump 175 kW
- Low-Cost Installation: Benefit from cost-effective installations supported by utility or government incentives.
- Swift Charging: Attract and retain customers with the ability to charge up to 80% in just 20 minutes.
- Flexible Payment Options: Provide drivers with multiple payment options, including mobile and credit card, enhancing user convenience.
- Durable and Reliable: Built to last, the JuicePump 175kW features a state-of-the-art liquid-cooling system for smooth operation in all conditions.
- Revenue Generation Options: Explore revenue opportunities with the Credit Card Reader (CCR) and in-app software payment options.
Disadvantages of the Enel X - JuicePump 175 kW
- Tesla Adapter Requirement: Compatibility with Tesla vehicles requires the use of an adapter.
- Initial Cost Investment: While incentivized, the initial installation may still involve upfront costs.
- Regular Maintenance Needed: Despite the advanced cooling system, regular maintenance is essential for optimal performance.
- Limited Coverage: As with any charging station, the accessibility of the JuicePump 175kW may be limited to specific geographic areas.
- Dependency on External Incentives: Installation cost savings depend on the availability and eligibility for utility or government incentives.
- Advanced Features May Require Additional Investment: Leveraging advanced software features like JuiceNet Enterprise may involve additional costs.