EVBolt VISION 360 EVB-DC-B1802XCCS1DHD
EVBolt - VISION 360 EVB-DC-B1802XCCS1DHD Charging Station
The VISION 360 EV Charger (EVB-DC-B1802XCCS1DHD) stands as a testament to innovation in the electric vehicle charging landscape. This robust dual-port DC charger is meticulously crafted to blend functionality with aesthetics, making it the ideal solution for high-traffic commercial locations like gas stations and highway corridors.
Its impressive technical specifications speak for themselves: 180kW per port charging capacity translates to rapid energy delivery, ensuring efficient refueling for even the most demanding electric vehicles. Compatibility with both CCS and CHAdeMO standards caters to a diverse range of EVs, while the integrated 55-inch HD LCD screen unlocks additional revenue streams through targeted advertising. The VISION 360 EV Charger is not just a charging station; it's a strategic investment in the future of clean mobility.
Charging Speed
The VISION 360 EV Charger boasts an impressive charging speed, delivering up to 180kW per port. This translates to roughly a 10% to 80% battery charge in about 30 minutes for most electric vehicles. This lightning-fast refueling minimizes downtime for drivers and maximizes station throughput in busy commercial settings.
Technical Specifications
| Model Name | VISION 360 EV Charger (EVB-DC-B1802XCCS1DHD) |
| Type | Dual-port DC Fast Charger |
| Input Voltage | 380V ± 15% 3 Phase 50Hz/60Hz |
| Output Voltage | 200V - 900V DC |
| Maximum Output Power | 2 x 180kW (360kW total) |
| Charging Standards | CCS1 (Combo), CHAdeMO |
| Operating Temperature | -25°C to +55°C |
| AC Input Breaker | 400A |
| DC Output Connector | CCS1 (Combo), CHAdeMO |
| Cable Length | 5m (optional lengths available) |
| Communication |
|
| Display |
|
| Dimensions (WxDxH) | 45.2 x 36.6 x 92.1 inches (1148 x 930 x 2340 mm) |
| Weight (typ.) | < 1763.7 lbs. (800kg), includes two charging connectors |
| Warranty | N/A |
| User Rating | N/A |
| Price | N/A |
Smart Features of EVBolt - VISION 360 EVB-DC-B1802XCCS1DHD
- Dynamic Load Balancing: Intelligently distributes power across both charging ports, ensuring efficient and safe charging even when both are occupied. This optimizes energy usage and prevents overloading, promoting grid stability.
- Remote Management and Monitoring: Access real-time data, manage charging sessions, and adjust settings conveniently from a secure web interface. This allows for proactive maintenance, remote troubleshooting, and data-driven optimization of charging operations.
- Customizable Advertising: Utilize the expansive 55-inch HD LCD screen to display targeted advertisements or informative content. This opens up additional revenue streams for station owners and enhances the user experience with relevant information.
- Seamless Payment Integration: Integrate various payment platforms for quick and secure charging transactions. This eliminates the need for cash handling and streamlines the charging process for users, improving convenience and satisfaction.
- Enhanced Security and Access Control: Restrict charging access to authorized users or specific vehicle types for added security and fleet management. This helps prevent unauthorized usage and ensures efficient allocation of charging resources.
Product guides and documents of EVBolt - VISION 360 EVB-DC-B1802XCCS1DHD
Advantages of the EVBolt - VISION 360 EVB-DC-B1802XCCS1DHD
- Dual-Port Efficiency: Simultaneous charging for two vehicles maximizes station throughput and revenue potential.
- Ultra-Fast Charging: 180kW per port significantly reduces charging times, enhancing driver convenience and station traffic flow.
- Future-Proof Technology: Supports both CCS and CHAdeMO standards, catering to a wider range of electric vehicles.
- Scalable Design: Modular architecture allows for easy expansion as demand for charging stations grows.
Disadvantages of the EVBolt - VISION 360 EVB-DC-B1802XCCS1DHD
- High Initial Investment: The advanced technology and features may lead to a higher upfront cost compared to basic chargers.
- Installation Complexity: Due to its dual-port nature and high power output, professional installation with specialized expertise might be required.
- Maintenance Requirements: Regular upkeep and potential repairs for the complex charging technology could incur ongoing costs.
- Space Considerations: The station's size and dual-port design might not be suitable for all locations with limited space.